Design the future

Object: Tsnap Mykolaiv OTG / Sumy Oblast

Installed equipment:Installed equipment:
  • Air/water heat pump Basic Line BM7010 Waterkotte, capacity 10.8 kW at A2/W35
  • Ventilation unit with heat recovery Profi Air Touch 400 / Frankische
  • The body's air-to-water pump provides heating and cooling of the building. The heating system is made in the form of underfloor heating. The facility is cooled by wall fan coils. The center is also equipped with an efficient ventilation system with heat recovery.