Installed equipment:
  • Pellet boiler Pelletstar Herz 30 kW
  • The greenhouse is heated by a Herz pellet boiler with a backup electric boiler. The heating system is arranged in the form of a thermoactive concrete foundation slab. For this, polyethylene pipes were integrated into the concrete. Ceiling heating systems for plants are made of Geberit Mapress stainless steel pipes. Tray heating is a combination of Geberit Mapress stainless pipes and PEX-a Fränkische polyethylene pipelines. All fastening systems from the HILTI company. Technological sewerage of the greenhouse is made of HDPE Geberit pipes with a welded connection, which guarantees high reliability of the system when laying in soil and concrete.