Design the future

The first Hajster AIR-60 heat pumps will soon be installed

October 16, 2023

The first industrial air-water heat pumps, Hajster AIR-60, will be dispatched for further installation at the site in the near future.

Three Hajster AIR-60 heat pumps, each with a capacity of 60 kW (at A-7/W35), will provide heating, cooling, hot water supply, and pool heating.


Hajster (Гайстер) heat pumps are modern thermal equipment designed for heating and hot water supply. The development and production of Hajster (Гайстер) heat pumps are entirely located in Ukraine.