Design the future

Object: hotel complex Grand Resort / Lviv

Installed equipment: 2 gas boilers based on:

  • Gas condensing boilers Vitodens Viessmann 65 kW - 7 pcs
  • Combined hot water tanks SI 200/1000 Paradirma
  • Danfoss valve.
  • WILO pumping equipment.